Buyer’s Responsibility: Site preparation, resting surface, utility connections, and local permits are the responsibility of the buyer. PlainsCraft does not install units. Buyers are responsible for verifying all local code requirements before installation.
Shower House Site Requirements
Foundation & Slab Type
Requires a level, properly prepared installation surface. Suitable foundations include concrete slabs, compacted gravel pads, decking, or block systems. Site preparation and foundation construction are the responsibility of the buyer.
Minimum slab dimensions: 8′ × 8′ per unit
Utility Connections Required
Buyers are responsible for verifying all local code requirements and preparing the necessary site infrastructure before installation. Typical utility requirements include:
- Water Supply: Standard water hose hookup
- Waste / Sewer: Ability to connect to a 3″ PVC sewer outlet
- Electrical: 30 amp / 120V service
- Gas / Propane: Based on preferred setup
Recommended Clearance
-+24″ on each side, +12″ on the back, +30″ in the front
Minimal base requirements would be 6′ 5″ x 4′ 5″
Delivery Access Requirements
- Forklift with capacity to hold 2,500 lbs
- 14′ clearance height
- Accessible drive path for a semi-trailer
Permits
If permits are required in your jurisdiction, the buyer is responsible for obtaining them before installation. PlainsCraft can provide product documentation to support permit applications.
Grade / Slope Requirements
Site must be reasonably level. Specific grade tolerance is being confirmed — contact us to discuss your site conditions.
Outhouse Site Requirements
Foundation & Slab Type
Requires a level, properly prepared installation surface. Suitable foundations include concrete slabs, compacted gravel pads, decking, or block systems. Site preparation and foundation construction are the responsibility of the buyer.
Minimum slab dimensions: 6′ × 8′ per unit
Utility Connections Required
Buyers are responsible for verifying all local code requirements and preparing the necessary site infrastructure before installation. Typical utility requirements include:
- Water Supply: Standard water hose hookup
- Waste / Sewer: Ability to connect to a 3″ PVC sewer outlet
- Electrical: 50 amp / 120V service *may vary based on HVAC/heater setup
Minimum Clearance
24″ on all sides of the unit.
Delivery Access Requirements
- Forklift with capacity to hold 1,500 lbs
- 14′ clearance height
- Accessible drive path for a semi-trailer
Permits
If permits are required in your jurisdiction, the buyer is responsible for obtaining them before installation. PlainsCraft can provide product documentation to support permit applications.
Grade / Slope Requirements
Site must be reasonably level. Specific grade tolerance is being confirmed — contact us to discuss your site conditions.